Skip to content
HardwareMap
esc
  • PageBrowse the directory219 parts
  • PageHow the index workshubs · dates · rules
  • PageSubmit a startupget a part number
  • PageApplication noteslists · build guides
  • CategorySilicon & ComputeSIL
  • CategoryIndustrialIND
  • CategoryDefenseDEF
  • CategorySpace & AerospaceAER
HardwareMap application noteAN-057Rev 26.09Build guides

AN-057 Build guides · cluster

PCB Fabrication and Assembly: One Vendor or Two?

PCB fabrication and assembly from one vendor or two: what each step does, the specs that cross between them, panelization, and a decision table by stage.

by the HardwareMap editors4 min read

Contents
  1. 1PCB fabrication and assembly, defined
  2. 2The specs that cross the boundary
  3. 3One vendor or two: the decision table
  4. 4A worked timeline: same board, two routes
  5. 5What to send either way
  6. 6Frequently asked questions

PCB fabrication and assembly are two separate processes: fabrication makes the bare board, assembly solders parts onto it. You can buy both from one vendor or split them between a board shop and an assembler. This note explains what crosses the boundary, when each setup wins, and sits under the PCB assembly guide alongside turnkey PCB assembly.

PCB fabrication and assembly, defined

FabricationAssembly
InputGerber or ODB++, drill files, fab drawingBare boards, BOM, centroid file, assembly drawing, parts
StepsImaging, etching, lamination, drilling, plating, solder mask, finish, silkscreen, electrical testPaste print, pick-and-place, reflow, AOI, X-ray, through-hole, test
OutputBare PCBPCBA, a working board
Quality standardIPC-6012 for rigid boardsIPC-A-610 and J-STD-001
Main cost driversLayers, size, finish, via type, tolerances, quantityPart count, unique parts, sides, packages, test

The standards are published by IPC. Both the bare-board and assembly standards use three classes; specify the class on each drawing, because a Class 3 assembly on a Class 2 board is a mismatch a customer audit will find.

The specs that cross the boundary

Most two-vendor problems are boundary problems. These specs are set by the fab shop and lived with by the assembler.

  • Surface finish. HASL is cheap but leaves uneven pads, which is a problem for fine-pitch parts. ENIG is flat and suits BGA and QFN. OSP is cheap and flat but has a short shelf life and limits rework. Pick the finish for your finest-pitch part.
  • Thickness and warp. 1.6 mm is the common default. Thin boards warp in reflow; large thin boards may need a carrier.
  • Panelization. Boards ride the line in panels with rails, fiducials and tooling holes. The assembler's conveyor and printer set the maximum panel size and minimum rail width. V-score or tab routing decides how boards break out after assembly.
  • Fiducials. Machine vision references for paste print and placement. Put global fiducials on the panel and local ones near fine-pitch parts.
  • Via-in-pad. Vias in BGA or QFN pads must be filled and capped, or solder wicks down them. That is a fab spec with an assembly consequence.
  • Packing and moisture. Bare boards absorb moisture. Vacuum-packed boards with a date code let the assembler decide whether to bake.

Online services publish their fab limits, which is a useful check before layout: JLCPCB's PCB capabilities lists layer counts, minimum trace, drill and finish options.

One vendor or two: the decision table

FactorOne vendor for bothBoard shop plus separate assembler
CoordinationOne order, one scheduleYou manage two schedules and a handoff
AccountabilitySingle owner of defectsBoundary disputes possible
Lead timeBoards flow straight to assemblyAdd a shipping leg and incoming inspection
Price at low volumeUsually lower, bundledUsually higher, two setups and freight
Price at volumeMay include a markup on boardsEach specialist quoted separately
Technology reachLimited to what the vendor's fab can doPick a specialist for HDI, flex, heavy copper or RF laminates
Controlled programsDepends on the vendorLets you pick qualified shops for each step

Pick one vendor for prototypes and early builds, especially through an online service that bundles fabrication, parts and assembly. The time saved on coordination is worth more than any board-price gap.

Pick two when the board needs a technology the assembler's fab cannot make (fine-line HDI, rigid-flex, RF materials), when a program requires a specific qualified board shop, or at volumes where separate quotes show a real gap. Contract manufacturers often run this way already: they buy boards from fab partners and you approve the list.

A middle route is common too. Some teams let the assembler buy the boards but name the board shop on the drawing, or ship the assembler a stock of bare boards from a shop they trust. Either way, write down who owns a board defect found during assembly before the first order, not after. A short clause in the purchase order, naming the acceptance standard and who pays for scrapped parts, saves a long email thread later.

A worked timeline: same board, two routes

Assume a 4-layer, 100-board build with all parts in stock. Times are planning placeholders; replace them with your vendors' quoted lead times.

StepOne vendorTwo vendors
Fabrication5 working days5 working days
Ship boards to assembler0, internal transfer2 to 5 days
Incoming inspection, bake if neededInternal1 day
Assembly and inspection3 to 5 working days3 to 5 working days
Totalabout 8 to 10 working daysabout 11 to 16 working days

The two-vendor route also adds a second setup and, if the board shop and assembler are in different countries, a customs entry. On a 100-board prototype that can be the difference between one revision a month and two. On a 10,000-board order the extra days matter less than the unit price, which is when the split earns its keep. For the cost side of the same choice, see the line-by-line breakdown in reading a PCB assembly service quote.

What to send either way

Send one data package to everyone and keep it under revision control: Gerber or ODB++ files, a fabrication drawing with stackup, finish, thickness and IPC class, a BOM with manufacturer part numbers, a centroid file and an assembly drawing. When there are two vendors, add a panel drawing that the assembler has approved, and ask the board shop for its electrical test report with every lot. The bill of materials example shows the BOM columns both will expect.

Frequently asked questions

What is the difference between PCB fabrication and assembly?

Fabrication makes the bare board: laminate, copper layers, drilling, plating, solder mask, surface finish and silkscreen. Assembly mounts and solders components onto that board and inspects the result. They use different machines, different skills and often different factories. A vendor that sells both may build the boards in one plant and assemble them in another, or buy the bare boards from a partner shop.

Is it cheaper to get PCB fabrication and assembly from one vendor?

Often, for small runs. A single vendor saves a shipping leg, a receiving inspection and the coordination time between two suppliers, and online services price the bundle aggressively. At higher volume the answer can flip, because a specialist board shop may beat the assembler's bundled board price, and a dedicated assembler may beat the board shop's assembly rate. Quote both ways once volume grows.

What specs must match between the board shop and the assembler?

Board thickness, surface finish, panel layout, fiducials, tooling holes, rails, maximum panel size, and the IPC class for both the bare board and the assembly. The assembler's line needs the panel to fit its conveyor and its stencil printer. If two vendors are involved, get the assembler to approve the panel drawing before the board shop builds it.

Who is responsible when a board fails, the fab shop or the assembler?

With one vendor, that vendor owns the failure and has to find the cause. With two, a failure at the boundary, such as a plating void, a warped panel or a finish that will not wet, can turn into an argument about whose process caused it. Clear incoming inspection, bare-board electrical test reports and agreed acceptance standards make that argument shorter.

HardwareMap follows the startups that move these boards from prototype to product. Building one? Submit it and get a part number.

Building one?

Submit it to the index and get a part number. Every entry is reviewed by hand.

Submit a startup

Related notesAll notes →

Sponsor spot20/20 open

Put your startup in front of everyone browsing the directory of 219 hardware companies.

$50/ week

First 10 spots · 10 left

$70/ week

Next 10 spots

Book through @icantcodefyi on X.