Hardware Startup Glossary: EVT, DVT, PVT, MOQ, NRE and 80 More
A hardware startup glossary: EVT, DVT, PVT, MOQ, NRE and 80 more terms from build stages, factories, BOMs, PCB assembly, compliance and cost.
by the HardwareMap editors5 min read
Contents
This hardware startup glossary defines the terms you will meet between first prototype and mass production: build stages, factory and supplier terms, BOM and document jargon, PCB assembly, compliance, and cost. Each entry is one or two lines, written for a founder about to sign a quote. It is the reference for the BUILD notes under how to start a hardware company.
Hardware startup glossary: build stages
- POC (proof of concept): a rough build that shows the core idea can work. Not representative of the product.
- Works-like prototype: functions like the product, looks like a lab bench.
- Looks-like prototype: looks and feels like the product, usually with no working insides.
- Works-like, looks-like: both in one unit, often the first build shown to customers.
- EVT (engineering validation test): first build with production-intent electronics. Proves the design works.
- DVT (design validation test): build with production-intent parts and tooling. Reliability, environmental and certification testing happen here.
- PVT (production validation test): build on the real line at rate. Proves yield, test coverage and process.
- MP (mass production): steady-state manufacturing after PVT sign-off.
- NPI (new product introduction): the process of taking a design through EVT, DVT and PVT into production.
- Design freeze: the point after which changes need a formal change order.
- T0, T1 samples: first shots from a new mold (T0) and from the first round of adjustments (T1).
- Golden sample: an approved reference unit the factory builds and inspects against.
- Ramp: increasing production rate after launch.
- Respin: a new revision of a circuit board to fix problems.
- Bring-up: first power-on and debugging of a new board.
The stages in practice are covered in prototype to production.
Manufacturing and supplier terms
- OEM (original equipment manufacturer): the company that owns the product and brand.
- CM (contract manufacturer): builds your design to your documents.
- EMS (electronics manufacturing services): a contract manufacturer for electronics assembly.
- ODM (original design manufacturer): designs and builds a product that you brand.
- MOQ (minimum order quantity): the smallest order a supplier accepts.
- NRE (non-recurring engineering): one-time costs to make a product buildable.
- Tooling: molds, dies, jigs and stencils made for your parts. Usually NRE.
- Lead time: time from order to delivery. Long-lead parts set the build date.
- DFM (design for manufacturing): designing parts to suit the process that makes them. See design for manufacturing.
- DFA (design for assembly): designing for fewer parts and simpler assembly steps.
- DFT (design for test): designing so units can be tested quickly on the line.
- DFMA: DFM and DFA applied together.
- Jig, fixture: a custom holder that positions a part for assembly or test.
- Cycle time: time to complete one unit or one shot of a process.
- Takt time: available production time divided by required output. The pace the line must hit.
- Yield: share of units that pass. First pass yield counts only units that pass without rework.
- Rework: fixing a failed unit instead of scrapping it.
- Turnkey: the manufacturer buys all parts. Consigned: you supply some or all parts.
- Kitting: gathering every part for a build into one set before it starts.
- Second source: an alternate supplier qualified for the same part.
Documents and BOM terms
- BOM (bill of materials): the structured list of every part in a product. Worked example in our bill of materials example.
- EBOM, MBOM: engineering BOM as designed, manufacturing BOM as built.
- MPN (manufacturer part number): the exact orderable part number from the maker.
- IPN (internal part number): your own number for a part.
- Reference designator: the label for a part position on a board, such as R14 or U3.
- AVL (approved vendor list): qualified manufacturers and parts for each BOM line.
- ECR, ECO: engineering change request and engineering change order, the controlled path for changing a released design.
- Revision: a version of a part or document. Form, fit and function decide revision versus new part number.
- PLM (product lifecycle management): software that holds BOMs, documents and change history.
- EOL (end of life): a part being discontinued. LTB (last-time buy) is the final order window.
- PCN (product change notice): a supplier's notice that a part is changing.
- CAD, STEP: design files and the neutral 3D format most suppliers accept.
- GD&T (geometric dimensioning and tolerancing): the drawing system for specifying allowed variation.
- Tolerance stack-up: how individual tolerances add up across mating parts.
How these documents stay in sync is the subject of bill of materials management.
Electronics and PCB assembly terms
- PCB, PCBA: the bare printed circuit board, and the board with parts assembled.
- SMT (surface-mount technology): parts soldered onto pads on the board surface.
- THT (through-hole technology): parts with leads through drilled holes.
- Gerber, ODB++: board fabrication file formats.
- Pick-and-place file (centroid file): part positions and rotations for assembly machines.
- Stencil: a metal sheet used to print solder paste onto pads.
- Reflow: melting solder paste in an oven to solder SMT parts.
- Panelization: arranging several boards on one panel for assembly.
- Fiducial: a marker on the board for machine vision alignment.
- BGA (ball grid array): a package with solder balls underneath, inspected by X-ray.
- AOI (automated optical inspection): camera inspection of solder joints and placement.
- ICT (in-circuit test): probes test individual components and nets on a bed of nails.
- FCT (functional circuit test): tests that the assembled board does its job.
More in the PCB assembly guide.
Compliance and quality terms
- FCC ID: identifier for a certified transmitter in the US.
- TCB (Telecommunication Certification Body): approves FCC certifications.
- SDoC (Supplier's Declaration of Conformity): FCC route for many non-transmitting devices.
- CE, UKCA: EU and Great Britain conformity markings.
- NRTL (Nationally Recognized Testing Laboratory): an OSHA-recognized safety lab such as UL, Intertek or CSA.
- Pre-compliance: informal emissions testing before the formal lab run.
- RoHS, REACH: EU rules on hazardous substances in electronics and chemicals in products.
- UN 38.3: transport test standard for lithium batteries.
- ITAR: US export controls on defense articles, run by the State Department.
- ISO 9001, ISO 13485: quality management standards, general and for medical devices.
- FAI (first article inspection): full measurement of the first production parts against the drawing.
- AQL (acceptable quality limit): the sampling standard for accepting a batch.
- CAPA (corrective and preventive action): the documented fix for a quality problem.
- RMA (return merchandise authorization): the process for returning failed units.
Cost and process for the big three are in hardware certifications.
Cost, money and logistics terms
- COGS (cost of goods sold): what it costs to build and deliver each unit.
- BOM cost: parts only, a subset of COGS.
- Landed cost: unit cost plus freight, duty, insurance and handling to your warehouse.
- Gross margin: price minus COGS, as a share of price.
- Amortization: spreading a one-time cost such as a mold across units. See the injection molding cost calculator.
- Incoterms: standard trade terms, such as EXW, FOB and DDP, that set who pays freight and carries risk. Published by the ICC.
- PO (purchase order): your binding order to a supplier.
- Deposit: upfront payment, common for tooling and first builds.
- Working capital: cash tied up in inventory and receivables before customers pay.
- HaaS, RaaS: hardware or robots sold as a service, billed per month or per use.
Frequently asked questions
What do EVT, DVT and PVT mean?
They are the three validation builds between prototype and mass production. EVT, engineering validation test, proves the design works. DVT, design validation test, proves it works when built with production-intent parts and passes reliability and certification testing. PVT, production validation test, proves the factory can build it at rate and yield on the real line. Mass production follows.
What is the difference between NRE and tooling?
NRE, non-recurring engineering, is any one-time cost to get a product ready to build: design work, test fixture development, line setup, programming. Tooling is one kind of NRE, the physical molds, dies and stencils that shape parts. Both are paid once, then amortized across units. Quotes often list them separately, so check whether a price includes both.
What is MOQ and can it be negotiated?
MOQ, minimum order quantity, is the smallest order a supplier will accept for a part or a build, set by setup cost, reel or packaging sizes and the supplier's economics. It can often be negotiated for a higher unit price, by buying from a distributor instead of the manufacturer, or by committing to future volume. Ask what drives the number before you push on it.
What is the difference between an OEM, an ODM and a contract manufacturer?
The OEM owns the product and the brand. A contract manufacturer builds the OEM's design to its documents. An ODM designs and builds a product, often from its own existing platform, which the OEM then brands. With an ODM you move faster but may not own the design files outright, so read the intellectual property terms closely.