AN-070 Build guides · cluster
Hardware Product Certifications: FCC, CE, UL and What They Cost
Hardware product certifications for startups: what FCC, CE and UL each cover, who issues them, published cost and time ranges, how modules cut the bill.
by the HardwareMap editors4 min read
Contents
Hardware product certifications are the tests and declarations a device needs before it can be sold in a given market: FCC rules for radio emissions in the US, CE marking for the EU, and safety listings such as UL. This note names each requirement, links the authority and gives published cost ranges. It is a budget guide, not compliance advice. It sits under how to start a hardware company.
The hardware product certifications most startups face
Products with lithium batteries usually add transport testing to UN 38.3 before they can ship by air, and often battery safety testing such as IEC 62133. Medical, automotive and aerospace products follow separate regimes not covered here.
FCC: certification or declaration
FCC Part 15 splits devices into intentional radiators, which transmit on purpose (Wi-Fi, Bluetooth, cellular, LoRa), and unintentional radiators, which emit as a side effect (any digital circuit with a clock).
- Certification is required for transmitters. A Telecommunication Certification Body reviews the test reports, and the product gets an FCC ID listed in the FCC database.
- Supplier's Declaration of Conformity (SDoC) covers many unintentional radiators. The product is tested, the responsible party (which must be in the US) keeps the records, and nothing is filed with the FCC.
- Modular approval is the startup shortcut. A radio module with its own modular grant can go into your product without a new transmitter certification, if you follow its integration conditions, including the approved antenna. The FCC's guidance is KDB 996369. Your product still has to meet Part 15 Subpart B for unintentional emissions.
Digital devices are also split by where they are sold. Class B covers products marketed for residential use and has the tighter emission limits. Class A covers products marketed only for commercial, industrial or business use. A device that could end up in a home is usually tested as Class B, and the class sets which label and manual statements you need.
CE marking: a declaration across directives
CE marking is not one test. The manufacturer works out which directives apply, tests to harmonised standards, compiles a technical file and signs a Declaration of Conformity. For a typical connected device that means the Radio Equipment Directive (which also covers EMC and electrical safety for radio products), or the EMC and Low Voltage directives for products without radios, plus RoHS for restricted substances.
One recent addition matters for anything connected. Since 1 August 2025, Delegated Regulation (EU) 2022/30 has applied cybersecurity requirements under the Radio Equipment Directive to internet-connected radio equipment, with the EN 18031 series as the harmonised standards. Ask your lab whether it applies to your device before you freeze firmware.
What hardware product certifications cost
Few labs publish prices, and quotes depend on radios, bands, power and markets. Published anchors:
Worked example for budgeting, a Wi-Fi sensor sold in the US, Canada and EU using a pre-certified module: no new transmitter certification if the module's conditions are met, so the core work is unintentional emissions testing, a CE technical file with RED testing, and a safety assessment for the power supply. Using a pre-certified, already-listed power adapter removes most of the mains safety scope. Ask the lab to quote FCC, ISED and CE as one test plan, because much of the measurement overlaps.
Retests are the cost that kills budgets. A failed emissions scan can mean a board respin, a new build and a second round of lab time. That is why a pre-compliance scan on DVT boards, a day at a lab or with a rented near-field probe kit, usually pays for itself. Put the certification line in your hardware startup costs budget from day one.
How to plan the certification path
- At EVT: list target markets and every radio. Prefer pre-certified modules and power supplies. Call a lab with your block diagram.
- At DVT: run pre-compliance emissions and, if relevant, ESD tests. Fix layout problems while boards are still changing. Our design for manufacturing services note covers reviews that can run in parallel.
- At PVT: formal testing on production-intent units, then labels, user manual statements and declarations.
- After launch: any change to radio, antenna, layout or power supply goes through the change process in bill of materials management, and the lab decides if it needs retesting.
Where certification sits in the full build sequence is covered in prototype to production. TCB, SDoC and the stage names are defined in the hardware startup glossary.
Frequently asked questions
Does every electronic product need FCC certification?
Not every product needs the full certification route. FCC rules have two authorization procedures. Certification, through a Telecommunication Certification Body, applies to transmitters and some other devices. Supplier's Declaration of Conformity covers many unintentional radiators, such as digital devices without radios, and needs testing but no filing. Which applies to a given product is a question for an accredited test lab.
Is CE marking a certification?
Mostly it is a self-declaration. The manufacturer identifies the EU directives that apply, such as the Radio Equipment Directive, the EMC Directive, the Low Voltage Directive and RoHS, tests to harmonised standards, keeps a technical file and signs an EU Declaration of Conformity. A notified body is involved only in some cases. The legal responsibility stays with the manufacturer either way.
Is UL certification legally required in the United States?
There is no single federal rule that every product must carry a UL mark. OSHA requires electrical equipment used in workplaces to be approved, which in practice means listed by a Nationally Recognized Testing Laboratory, and UL is one of several. Retailers, insurers and building inspectors often require a listing too. Intertek's ETL and CSA marks come from other recognized labs.
Does using a pre-certified radio module mean my product is certified?
No. A module with an FCC modular grant can let the host product skip a new transmitter certification, if you follow the module maker's integration conditions, such as the approved antenna. The host product still has to meet the unintentional radiator rules in Part 15 Subpart B, and it must be labeled with the module's FCC ID. CE and other markets have their own conditions.
When should a hardware startup start on certifications?
Before the design is frozen. Pick the target markets and the certification route at the EVT stage, run a pre-compliance scan on DVT boards, and book formal testing on production-intent units. Problems found in formal testing often mean a board respin. A short call with a test lab early, with your block diagram and target markets, costs little and sets the plan.
HardwareMap catalogues hardware startups like parts on a datasheet. Building one? Submit it and get a part number.
Building one?
Submit it to the index and get a part number. Every entry is reviewed by hand.